Metal Mine

Metal Mine
Metal Mine
Cost
Metal 60
Crystal 15
Each level costs × 1.5

A Metal Mine is a building that produces Metal. Metal is one of the 3 basic resources required by all emerging and established empires for the construction of structures and ships, and researching.

In-Game Description

Metal is the primary resource used in the foundation of your Empire. At greater depths, the mines can produce more output of metal.You can use the available metal for use in the construction of buildings, ships, defense systems, and research. As the mines drill deeper, more energy is required for maximum production. As metal is the most abundant of all resources available, its value is considered to be the lowest of all resources for trading.

Statistics

Costs by Level

\text{Cost} = \text{Base Cost} \cdot 1.5^{\text{Metal Mine Level}- 1}

(Base Cost is 60 Metal and 15 Crystal)

Production

\text{Production} = 30A \cdot M \cdot 1.1^{M}
A \equiv \text{Universe Acceleration Factor}
M \equiv \text{Metal Mine Level}

Please keep in mind, that this is only the Metal produced by Metal Mines. There is also a base production that each planet puts out without any mine. This number can be seen under the resource settings and is equal to 30 times the acceleration factor. With that factored in, production will equal:

\text{Production} = 30A \cdot M \cdot {1.1}^{M}+30A

Additionally production could depend on Plasma Technology Level. e.g.

\text{Production} = 30\left(1 + \frac{PT}{100}\right) \cdot A \cdot M \cdot {1.1}^{M} + 30A
PT \equiv \text{Plasma Technology Level}

(Note that Plasma Technology does not affect the base resource generation rate)

Energy Consumption

\text{Energy} = \left\lfloor 10 \cdot \text{Metal Mine Level}\cdot 1.1^{\text{Metal Mine Level}}\right\rfloor

Resource Stat Table

LevelMetal
Cost
Crystal
Cost
Energy
Use
Metal Production
Per HourPer DayPer Week
0000307205,040
1601511337925,544
2902225721,72812,096
313533401192,85619,992
420250591754,20029,400
530375812415,78440,488
64551131073187,63253,424
76831701374099,81668,712
81,02525617251412,33686,352
91,53738421363615,264106,848
102,30657626077818,672130,704
113,45986431494122,584158,088
125,1891,2973771,12927,096189,672
137,7841,9464491,34632,304226,128
1411,6772,9195321,59438,256267,792
1517,5154,3786271,87945,096315,672
1626,2736,5687362,20552,920370,440
1739,4109,8528602,57761,848432,936
1859,11514,7781,0013,00272,048504,336
1988,67322,1681,1633,48683,664585,648
20133,01033,2521,3464,03696,864678,048
LevelMetal
Cost
Crystal
Cost
Energy
Use
Per HourPer DayPer Week
Metal Production
Per HourPer DayPer Week
21199,51549,8781,5554,662112,608783,216
22299,27374,8181,7915,372128,928902,496
23448,909112,2272,0606,178148,2721,037,904
24673,364168,3412,3647,091170,1841,191,288
251,010,046252,5112,7098,126195,0241,365,168
261,515,070378,7673,0999,296223,1041,561,728
272,272,605568,1513,54010,619254,8561,783,992
283,408,907852,2264,03812,113290,7122,034,984
295,113,3611,278,3404,60113,800331,2002,318,400
307,670,0421,917,5105,23515,704376,8962,638,272
3111,505,0632,876,2655,95117,850428,4002,998,800
3217,257,5954,314,3986,75720,269486,4563,405,192
3325,886,3926,471,5987,66522,992551,8083,862,656
3438,829,5899,707,3978,68726,058625,3924,377,744
3558,244,38414,561,0969,83629,507708,1684,957,176
3687,366,57621,841,64411,12933,385801,2405,608,680
37131,049,86432,762,46612,58237,744905,8566,340,992
38196,574,79649,143,69914,21442,6401,023,3607,163,679
39294,862,19573,715,54816,04748,1391,155,3368,087,417
40442,293,292110,573,32318,10454,3111,303,4649,124,265
LevelMetal
Cost
Crystal
Cost
Energy
Use
Per HourPer DayPer Week
Metal Production
Per HourPer DayPer Week
41663,439,939165,859,98420,41261,2351,469,64010,287,480
42995,159,908248,789,97723,00169,0021,656,04811,592,336
431,492,739,863373,184,96525,90477,7091,865,01613,055,112
442,239,109,795559,777,44829,15787,4682,099,23214,694,624
453,358,664,692839,666,17332,80198,4022,361,64816,531,536
465,037,997,0391,259,499,26036,883110,6472,655,52818,588,696
477,556,995,5581,889,248,89041,453124,3582,984,59220,892,144
4811,335,493,3372,833,873,33446,569139,7043,352,89623,470,272
4917,003,240,0054,250,810,00152,293156,8763,765,02426,355,168
5025,504,860,0086,376,215,00258,696176,0864,226,06429,582,448

Notes:

  1. Information in this table is based solely on the formulas found on this page
  2. In the above figures reference should be made to 'game hours', particularly on servers with increased speed
  3. This does not count possible lack of energy
  4. All Numbers are rounded down except for "Energy Use", which is rounded up in order to maintain accuracy with the tested in-game values. Not all in-game values were tested

Production and Profit vs Cost

\text{Time (hours)}=\frac{3}{4\cdot\text{Metal Mine Level}}\cdot\left(\frac{15}{11}\right)^\text{Metal Mine Level}

The formula above gives the amount of time in which the total metal production reaches the cost of that level of the metal mine.

The graph above says that, for example, if you built metal mine mine level 12, it will take less than 5 hours to take back your metals which you used to built that level. Metal mine level 12 costs 5189 metal, and produces 1297 metals per hour. Indeed, it takes about 4 hours to take you metal back.

Example:

From the graph we observe that if you built metal mine level 30, it will take it 20 days to produce as much as metal you used to built that level.

Metal mine 30 costs 7670042 metals, and it produces 15704 metals per hour. That makes 7670042 / 15704 = 488.41 hours = 20.35 days to produce as much as metal you used to built metal mine level 30.


\text{Time (hours)} = \frac{20}{\text{Metal Mine Level} + 10} \cdot {\left(\frac{15}{11}\right)}^{\text{Metal Mine Level} - 1}

The formula above gives after what hours the profit of upgrading metal mine adds up to catch the cost of upgrading. In other words, upgrading your metal mine will cause an increment in your metal production, if you integrate this increment over time, after some time this integration will be equal to the cost of the upgrading. This formula gives this time period.

The graph above says that, if you upgrade your metal mine from level 13 to level 14, it will take approximately two days to start harvesting your investment.

If we do the calculations with actual data, upgrading from level 13 to level 14 gives 1594 - 1346 = 248 metal/hour. Metal mine level 14 costs 11677 metal. So the time to start making profit is

\frac{11677 \; \text{metal}}{1594 \; \frac{\text{metal}}{\text{hour}} - 1346 \; \frac{\text{metal}}{\text{hour}}} = 47.08 \; \text{hours}
\frac{20}{14 + 10} \cdot {\left(\frac{15}{11}\right)}^{14 - 1} = 46.98 \; \text{hours}

From the graph above, we observe that if one upgrades his metal mine from level 31 to level 32, he will start to make profit out of it after one year, for level 39 to level 40 it becomes 3000 days!

Note that, all these production and profit calculations are considered only on metal production. We assume that crystal and energy is free. If we were to consider crystal and energy issues, the formula would have been multi-variable, the graph would have been 4th dimensional. And also if we considered fusion reactor and solar satellites as energy source it would have been a total mess. So in order to keep things simple, it is only explained on metal production.

Note furthermore, that one should take into account the opportunity cost of the metal used. The opportunity cost  is the sacrifice related to the second best choice available to someone. In this case for example, however difficult to determine, one could consider expanding his or her fleet to increase income from raiding. If the expected additional income from raiding exceeds the increase of metal production, one should choose to expand his of her fleet instead.

See also

Cost per level

Level Metal Crystal Deuterium
1 60 15
2 90 23
3 135 34
4 203 51
5 304 76
6 456 114
7 683 171
8 1.025 256
9 1.538 384
10 2.307 577
11 3.460 865
12 5.190 1.297
13 7.785 1.946
14 11.677 2.919
15 17.516 4.379
16 26.274 6.568
17 39.410 9.853
18 59.116 14.779
19 88.674 22.168
20 133.010 33.253
More in Buildings